Improved layout for hydropower plant
TLS presented the WGE Team with an improved design for the hydropower plant layout which is better fitted to the constraints of the site. Adrian Clayton from TLS Renewable Consulting presented our team with an improved layout design for the hydropower plant. The advantages are:
- Less abrupt intake
- More streamlined
- Reduced footprint
- Regulation fish and eel pass
- Potentially cheaper to instal